The most common question we get during a site visit is: “How much will the whole thing cost me?” The answer “it depends” helps no one, so we prepared a sample budget – an example of a year-round 118 m² turnkey log house – and broke it down item by item. The amounts are indicative; the real price depends on the design, the plot and a site visit.

Foundations and substructure

The example assumes a sloping plot, which means more earthworks than usual. Strip foundations, gravel bedding, a foundation slab with waterproofing and radon protection, sewer and water connections up to the plot boundary. In total 21 400 €. On a flat plot, expect roughly a fifth less.

Log structure

Solid 240 mm spruce profiles, including fabrication, transport and installation of walls, ceiling beams and roof truss. This is the biggest item: 58 900 €. The price includes drying and planing the timber – it’s not worth cutting corners here, undried wood cracks and settles unevenly.

Roof

Standing-seam metal roofing, roofing underlay, battens, gutters and flashings. 17 200 €. If you chose concrete tiles, the price is similar, but the roof truss has to be sized for the higher weight.

Windows, doors and insulation

Wood-aluminium triple-glazed windows, entrance door, wood-fibre insulation of roof and floor: 24 600 €. Log walls made from 240 mm profiles need no additional insulation.

E-SHOP · 90 % IN STOCKOrder building materials onlineTimber, insulation, roofing and fasteners delivered to your site.To the e-shop →

Services and technology

Electrical installation, water, drainage, air-to-water heat pump with underfloor heating and heat recovery ventilation: 31 800 €. A heat pump costs more upfront, but at today’s energy prices it pays for itself within seven years.

Finishing works

Floors, tiling, sanitary ware, a standard kitchen, stain on the walls inside and out: 26 300 €. This is where the client has the most room to decide – the gap between “basic” and “premium” can easily be 20 000 €.

The contingency people forget

We always include an 8 % contingency in the budget for the unexpected: rock in the foundations, design changes, a longer winter. The example assumes about half of it is used – 7 100 €.

Total

In this example the total turnkey price excluding the plot comes to 187 300 € incl. VAT, which is roughly 1 590 € per m² of usable floor area. For comparison: a masonry house of the same size from us comes out 5–10 % cheaper, a panel-built timber house 10–15 % cheaper. A log house is more expensive because of the volume of solid wood, but it needs no facade, insulation or render – and it’s built in 6 to 9 months.

Want an indicative budget for your plot? Fill in a free inquiry and we’ll get back to you within two working days with a date for a site visit.

Calculate your materials: Configurator: Sawn timber and beams

Was this article helpful?
Written by the DOMVEA teamBuilders from Namestovo. We build houses, log homes and roofs across Slovakia and Czechia.What we build →