1What are you building
2Dimensions
We place posts at most every 3 m and rafters every 80 cm (with polycarbonate, under every sheet joint). Dimensions and cross-sections are an indicative design — the structural engineer's design is binding.
3Joists
More options
4Anchoring, screws and finish
Post bases (brackets)
Coating
5Roof
Loading 3D preview…
Drawings: floor plan and section
Floor plan—
Posts—
Rafters—
Timber total—
Timber cutting plan
Your materials
Total incl. VATapproximate, excl. delivery—
How we calculate
  • Posts in rows along the width, at most every 3 m; with a depth over 4.5 m we add a middle row. A wall-mounted pergola has a wall plate at the back instead of posts. A carport has posts only along the long sides (no middle row, driveway and parking free of posts), purlins lengthwise and rafters across. A gable gazebo has a tie beam on each gable with a post under the ridge purlin. Hip and pyramid gazebos have perimeter purlins on all 4 sides, hip rafters (purlin section) from the corners to the ridge / apex, the ridge is carried by a post on the tie beam.
  • Purlins across the full width + 25 cm overhang on each side. Rafters evenly spaced at max. 80 cm; under polycarbonate exactly beneath the sheet joints (sheet 1.05 m + 20 mm expansion gap = every 1.07 m from the roof edge + a rafter at the other edge). Length along the slope + 30 cm overhang. For hipped and pyramid roofs: jack rafters (to the hip) at the same spacing, hip = √(plan length² + height²) including overhang; on a pyramid roof the shorter sides have a steeper pitch and overhang so that the eaves are at the same height all round.
  • KVH beams are sold in the stock length from the catalogue (13 m) — we lay out the pieces on the fewest bars (4 mm saw cut) and use offcuts for further pieces. We show waste in metres and euros and suggest savings. We cut the beams exactly to size — free with your order, the cutting plan goes with the order.
  • TBS screws: 2 per post–purlin joint, 1 per rafter seat, 2 per brace end; length by member height — where possible we unify lengths so you buy as few packs and have as few leftover screws as possible. A base (bracket) under each post.
  • Finish: surface of all timber × coats ÷ manufacturer coverage.
  • We check sections indicatively as a simple beam of C24 timber (bending strength 24 N/mm², modulus of elasticity 11,000 N/mm², deflection up to L/300) with a roof load of 0.25 kN/m² and roof snow of 0.8 kN/m². If a section fails, we warn you and suggest a larger one from the shop. This is an indicative design, the structural engineer has the final say.
Total incl. VAT—