Rothoblaas TRASPIR EVO UV 210 facade breathable membrane

Extremely durable UV-stable membrane for modern ventilated facades. Rothoblaas TRASPIR EVO UV 210 is a premium breathable membrane designed specifically for facades with open joints (up to 30 mm wide). With a weight of 210 g/m2 and a special coating it provides uncompromising protection of the insulation against moisture, wind and long-term sunlight. The ideal choice for designer wood and composite cladding.
TRASPIR EVO UV 210: When the façade breathes and withstands the sun
Modern architecture loves ventilated facades with gaps between the slats. However, these joints expose the insulation layer to its greatest enemy – UV radiation. Rothoblaas TRASPIR EVO UV 210 was developed precisely for these demanding conditions. It is a barrier that keeps out water and wind but lets the house “breathe”.
Why is TRASPIR EVO UV 210 top of the market?
-
Uncompromising UV stability: The membrane is tested for extreme sun exposure in open joints (up to 30 mm wide, with joints making up to 40 % of the facade area).
-
High grammage and mechanical strength: With a weight 210 g/m2 the membrane is extremely tear-resistant during installation and in strong gusts of wind.
-
Black aesthetics: The membrane is deep black with no print on visible areas, so it looks unobtrusive in facade joints and creates a perfect shadow background for wooden cladding.
-
Heat resistance: Withstands temperatures up to +100 °C, which is crucial in summer, when dark facade cladding can get very hot in the sun.
Where can you use this membrane?
-
Open-joint facades: Wooden substructures, Siberian larch, aluminium or composite slats.
-
Timber-frame and prefabricated houses: Where the highest level of structural protection is required.
-
Renovations: When modernising the appearance of buildings with an emphasis on long service life.
Don't risk damaging your insulation with a cheap membrane. TRASPIR EVO UV 210 is the certainty that protects your building inside and out.
Technical properties: TRASPIR EVO UV 210
| Property | Standard | Tested value |
| Weight per unit area | EN 1849-2 | 210 g/m2 |
| Thickness | EN 1849-2 | 0,3 mm |
| Vapour permeability (Sd) | EN 1931 | 0,04 m |
| Watertightness | EN 1928 | class W1 |
| UV resistance (without cladding) | EN 13859-2 | 10 000 h (>12 months) |
| UV stability (joints up to 50 mm) | EN 13859-2 | permanent |
| Reaction to fire | EN 13501-1 | class B-s1, d0 |
| Tensile strength MD/CD* | EN 12311-1 | 300 / 200 N/50mm |
| Strength after artificial ageing | EN 1297 / 12311-1 | 290 / 190 N/50mm |
| Elongation MD/CD* | EN 12311-1 | 25 / 25 % |
| Elongation after artificial ageing | EN 1297 / 12311-1 | 20 / 20 % |
| Nail pull-through resistance | EN 12310-1 | 120 / 120 N |
| Temperature resistance | - | -40 / +120 °C |
| Flexibility at low temperatures | EN 1109 | -40 °C |
| Resistance to air penetration | EN 12114 | < 0,02 m3/(m2·h·50Pa) |
| Thermal conductivity (?) | - | 0,3 W/(m·K) |
| Specific heat capacity | - | 1800 J/(kg·K) |
| Density | - | approx. 700 kg/m3 |
| Diffusion resistance factor (u) | - | approx. 130 |
| Flame spread index (FSI) | ASTM E84 | 5 |
| Smoke development index (SDI) | ASTM E84 | 300 |
*MD = machine direction; CD = cross direction **with a maximum joint area ratio of 40 %
Installation instructions
To achieve maximum functionality and service life of the system, follow this procedure:
-
Application: Unroll the membrane directly onto the surface (insulation/structure). Gradually remove the release film from the adhesive layer and press the membrane firmly to ensure perfect adhesion.
-
Overlaps: To achieve optimal sealing, ensure an overlap between the individual membrane strips of at least 15 cm.
-
Professional details: For correct and professional installation, it is essential to use sealing tape under the counter battens (nail sealing tape) at nail or screw fixing points.
You will find more detailed installation information in the manufacturer's technical data sheet.
- Professional details: For correct and professional installation, it is essential to use sealing tape under the counter battens (nail sealing tape) at nail or screw fixing points.
- Payment
- Preparation
- Phone call
- Delivery
- Support
Related products
How it works.
- STEP 1OrderChoose the variant and quantity, then order online or by phone.
- STEP 2Invoice paymentWe'll send a proforma invoice, or you can pay by card right when ordering.
- STEP 3Order processingOnce payment is received, we start working on the order and arrange a date.
- STEP 4Preparing goodsWe will prepare the goods for loading. The delivery time is shown for each product.
- STEP 5DeliveryWe deliver to the site or address. Please make sure someone is present for unloading.
- KROK 6Installation and supportOn request we also install the material – we are a construction company.
Material left over?
Sell it to a neighbour.
Unopened packs, battens, roofing or tools. Post a listing in a minute.














