Skip to content
Back
Tapes, sealants and more...

Rothoblaas MULTI BAND UV – Fire-resistant, plasterable tape for complex details

27,75 € / pc incl. VATOn order
AVAILABILITYOn orderDELIVERYTOPTRANS within 5 days· to your doorCODEP00763MANUFACTURERRothoblaas

Premium adhesive tape with enhanced fire safety and UV stability. Rothoblaas MULTI BAND UV is specially developed for airtight joints of façade membranes in ventilated façades with open joints. In addition to permanent UV stability, it features a certified reaction to fire class B-s1, d0, meeting the strictest safety requirements for modern buildings.

MULTI BAND UV: When safety and durability go hand in hand

For high-rise and public buildings, UV stability is not the only parameter that matters. Rothoblaas MULTI BAND UV provides a solution for places where fire safety is a priority. This black, high-performance tape is designed not to contribute to the spread of flames while protecting the structure from moisture and sun.

Why choose MULTI BAND UV?

  • Top-class fire protection: The tape belongs to class B-s1, d0. This means it is very hard to ignite, produces minimal smoke when burning and does not drip burning particles.

  • Permanent UV resistance: Designed for facades with open joints up to 50 mm. Even after years of direct sun exposure, it does not lose its elasticity or tack.

  • Universal helper: Although designed primarily for facades, thanks to its extreme adhesive strength (acrylic adhesive) it bonds perfectly to membranes, wood, metal and plastics.

  • Clean design without compromise: The deep black colour without print ensures that the joints in the gaps of the timber cladding are practically invisible.

Areas of use:

  • Buildings with increased fire safety requirements.

  • Taping the overlaps of façade membranes in open-joint systems.

  • Detail solutions for connecting membranes to windows and doors.

Give your facade the highest standard of protection. MULTI BAND UV protects your investment from sun and wind and increases fire resistance.

Technical properties:

Property Standard Tested value
Thickness EN 1942 0,33 mm
Reaction to fire EN 13501-1 class B-s1, d0
Adhesion ISO 29862 >= 30 N/25 mm
Vapour permeability (Sd) EN 1931 15 m
UV stability (joints up to 50 mm) - permanent
Weatherproofing - 24 months (without cladding)
Temperature resistance - -40 / +100 °C
Application temperature - -10 / +40 °C
VOC (volatile compounds) ISO 16000 class A+
BUILDING MARKETPLACEPacks left over after your build?Offer them to your neighbours in the marketplace. Listing is free while the marketplace is launching.Add a listing →
After ordering
  1. Email
  2. Payment
  3. Preparation
  4. Phone call
  5. Delivery
  6. Support
A whole build or a larger quantity? Send us a bill of quantities and we'll price it individually.Enquiry →
PRICE PER PIECE · INCL. VAT27,75 €
−2 %with registration27,20 €Register →
EXCL. VAT22,56 €
Width60 mm
60 mm
Length25 m
25 m
1How many do you need?optional · we'll calculate it for you
2Quantityunit: pcs · shipping is calculated in the basket
pcsTOTAL INCL. VAT
Add to cart✦ MATERIAL LISTAdd to listLIST
Compare Assistant
FOR TRADESPEOPLE AND COMPANIESOrdering for a customer?Prepare a quote with your logo and price, or we will ship the goods straight to them.
Prefer to order by phone?Call us and we will place the order for you.+421 904 922 808
Offers from the building marketplacevisible to registered customers only
MarketplaceAll →
Building bazaar nearbynothing for this product yetView marketplace
Timber-frame house by DomveaDOMVEA BUILDSWe can also build your entire houseTurnkey timber-frame houses with materials delivered straight to the site.View houses →
⬢3D CONFIGURATORDesign it yourself
4 × 3 m
Calculate membranes and tapes in the configuratorStart →
ACLIENT ZONEANDESA● free
Your whole build on your phone.
Material deliverystatus and date
invoices calculations site diary
FROM ORDER TO INSTALLATION

How it works.

Have a question? +421 904 922 808 →
  1. STEP 1OrderChoose the variant and quantity, then order online or by phone.
  2. STEP 2Invoice paymentWe'll send a proforma invoice, or you can pay by card right when ordering.
  3. STEP 3Order processingOnce payment is received, we start working on the order and arrange a date.
  4. STEP 4Preparing goodsWe will prepare the goods for loading. The delivery time is shown for each product.
  5. STEP 5DeliveryWe deliver to the site or address. Please make sure someone is present for unloading.
  6. KROK 6Installation and supportOn request we also install the material – we are a construction company.
Offers and news once a month.
No spam — just discounts on materials and practical building tips.
By subscribing you agree to the processing of your e-mail. You can unsubscribe at any time.
NEW BUILDING MARKETPLACE

Material left over?
Sell it to a neighbour.

Unopened packs, battens, roofing or tools. Post a listing in a minute.

0 € free listing buy directly from the seller your listing goes live at once